Shandong Jinhaosanyang Environmental Protection Equipment Co., Ltd.
Main products:Buried Sewage Treatment Equipment,Anaerobic Reactors,Belt Type Filter Press,Air Flotation Machine,Activated Carbon Filter
Products
Contact Us
  • Contact Person : Mr. Huang Hao
  • Company Name : Shandong Jinhaosanyang Environmental Protection Equipment Co., Ltd.
  • Tel : 86-536-5838610
  • Fax : 86-536-6184876
  • Address : Shandong,Weifang,No.106 Shungeng Road,Economic Development Area of Zhucheng City,China
  • Country/Region : China
  • Zip : 262200

DCW type Integrated Underground wastewater treatment equipment

DCW type Integrated Underground wastewater treatment equipment
Product Detailed
wastewater treatment equipment 1.capacity:1~50m3/h 2.total weight:5.5-42t 3.fan power:0.4-11kw 4.cover area:6-185m2

                   Underground wastewater Treatment equipment  

I.Advantages:

1.Compact structure,small land occupation.

2.One unit with full components,efficient operation.

3.Combine the nucleus and assistant treatment,with stable water quality.

4.Apply qravity flow,saving power.

5.Simple operation,no professional management.

 

II.Equipment structure:

1. High efficiency biochemistry treating field:apply new type of filler,with large specific surface area,strong adhesive attraction and well attack resistance ability.

2.Settling pond:apply inclind tube settling with high efficiency,small volume of settling pond.

3. Filtering pond:apply light filter material,water power for backwashing,so there is no need of backwashing pump, and it saves electricity.

4. Contact sterilized pond:mixing thimerosal and wastewater to ensure the out water index.

5. All of the system applies integrated treatment as equipment nucleus,assisted pump,blower and thimerosal dosing equipment.

 

III.Design parameters:

Design water treatment discharge 500m3/d

Inlet water quality SS=300mg/L,COD=500mg/L,BOD=300mg/LDesign effluent water quality SS =10mg/L,COD= 50mg/L,BOD =10mg/L,LAS= 2mg/L

 

IV.Explanation:

There are two types of equipment installed:above the ground and underground.

Need average resistance of pressure from foundation,and the foundation must bu standard. If the equipment installed underground,the relatively level of foundation and terrace must same with equipment high. As soon as the equipment perched qualified,it must be filled water avoiding ground water float the equipment.

Before the equipment is used,we must check equipment system device and blower engine oil normal or not,until all of them are qualified.

Then users should establish a suit of timely repair institution,blower cant reversion,timely check the blower engine oil,and clean the blower are inlet mouth regularly,keep the blower clean and repair the pump per 5000h.

V.Progress figure:

VI.Specifications

 



Copyright Notice @ 2008-2022 ECOL Limited and/or its subsidiaries and licensors. All rights reserved.